DoyouKnowa. Find a tradesperson

Why 4 in 10 home jobs go over quote (and how to avoid it in Berkshire)

41% of home improvement jobs cost more than quoted, by £1,325 on average. Here's why it happens and how Berkshire homeowners can keep projects on budget.

Hiring advice

Why 4 in 10 home jobs go over quote (and how to avoid it in Berkshire)

4 min readBy DYKA Marketing Team

Answer first: According to Checkatrade research, 41% of UK home improvement jobs end up costing more than the original quote, by £1,325 on average. On jobs over £5,000, the average overspend is £2,807. The fixes are simple: get a detailed written quote, build in a buffer of at least 10%, and pay for a survey before big jobs.

Key takeaways

  • 41% of home improvement jobs cost more than quoted, by £1,325 on average, and by £2,807 on jobs over £5,000.
  • Hidden problems, a vague scope, changes along the way and having no written quote are the four main causes.
  • Get detailed written quotes, allow a buffer of at least 10% and use a surveyor for big jobs.

Why jobs go over quote

There’s a name for it now: “renoflation”. It usually comes down to four things.

  1. Hidden problems. Rotten joists, old wiring or a dodgy drain only show up once the floor is up or the wall is open. Among people whose £5,000+ jobs went over, just 11% had used a surveyor beforehand.
  2. A vague scope. “Do the bathroom” means different things to different people. If the quote doesn’t list what’s included, the gaps get filled later, at a price.
  3. Changes along the way. Moving a socket, upgrading the tiles, adding a radiator. Each change is reasonable; together they add up.
  4. No written quote at all. Only around a third of people get a written quote for jobs over £500. A chat on the doorstep is very hard to hold anyone to.

Why it bites harder in Berkshire

Day rates in London and the South East typically run 20% to 40% above national guides, so every extra day costs more here. Berkshire’s housing adds its own surprises: listed and older homes in Windsor and Maidenhead, busy terraced streets in Reading where access and party walls matter, and newer estates in Wokingham where planning conditions can catch people out.

How to keep your job on budget

  • Get two or three detailed written quotes for exactly the same scope, and compare line by line rather than just the total.
  • Ask what’s excluded. VAT, materials, skip hire, scaffolding, making good and waste removal are common gaps.
  • Prefer a fixed price for well-defined jobs, and agree a day rate plus a clear estimate for work where the scope can’t be known upfront.
  • Build in a buffer of at least 10% on larger jobs, as Checkatrade recommends.
  • Use a surveyor for big projects. It costs money upfront and often saves far more.
  • Agree changes in writing, with the price, before the work is done.
  • Pay in stages tied to finished work, not large sums upfront.
  • Check credentials. Gas work needs a Gas Safe registered engineer, and notifiable electrical work such as a new consumer unit needs a registered electrician or Building Control sign-off.

A word to trades

Clear quotes win work. Customers who understand exactly what’s included, and what would cost extra, are far more likely to say yes and far less likely to argue at the end. If you’re a Berkshire trade who quotes properly, join DoyouKnowa and get matched with homeowners who value it.

Questions people ask

What’s the difference between a quote and an estimate?

As a rule of thumb, a quote is a fixed price for clearly described work, while an estimate is an educated guess that can change. If you want certainty, ask for a written quote and check the wording. This isn’t legal advice; Citizens Advice can help if you’re in a dispute.

How much buffer should I allow for a building project?

At least 10% on larger jobs, and more for older properties where there’s a higher chance of hidden problems.

Can a builder charge more than the quote?

Only in limited circumstances, such as when you’ve agreed extra work or the quote clearly allowed for unknowns. Agree any change in writing before it’s done.

How many quotes should I get?

Two or three detailed, written quotes for the same scope is a sensible rule.

More local guides: What trades really cost in Berkshire.

Sources

Fewer surprises, better trades

DoyouKnowa picks the three best-fit, recommended local tradespeople for your job, so you start with people others have trusted. Tell KnowaChat what you need at doyouknowa.ai.